Cleaning Up : Mass Design Group built a hospital for cholera patients atop a watertreatment facility in Port-au-Prince
Foilsithe in: | MARK (2015)57 = August-Sept., S. 160-167 |
---|---|
Príomhchruthaitheoir: | |
Formáid: | Alt |
Teanga: | German |
Foilsithe / Cruthaithe: |
2015
|
Ábhair: | |
Le fáil in: | In:
MARK |
Gairmuimhir: | MAG ZS Mark 2015(57 |
---|